Bathroom refit with tile inserts

May 18, 2009 at 12:03 am | Posted in Bathrooms, plumbing, radiators, showers, Tiling | Leave a comment
Tags: , , , , , , ,

1 300 x 200 bath 1This bathroom was refitted to change the toilet, basin, radiator, bath and shower. 

The tiles used had different coloured inserts

 

 

 

2 300 x 200 bath 2

 

 

 

 

 

 

3 300 x 200 bath tiling before grout and inserts

 

 

 

 

 

 

4 300 x 200 toilet and basin

 

 

 

 

 

 

5 300 x 200 basin

 

 

 

 

 

 

6 200 x 250 bath and shower7 200 x 250

 

 

 

 

 

 

 

8 200 x 250 radiator9 200 x 250 shower

 

 

 

 

 

 

 

10 200 x 25011 200 x 250 green tile insert

Bathroom refit with basin unit

May 17, 2009 at 11:19 pm | Posted in Bathrooms, Ensuites, plumbing, radiators, showers, Skimmed ceilings, Tiling | Leave a comment
Tags: , , , , , , , , , , , ,

1 250 x 200 bath controlsFor this bathroom refit the bath, basin, toilet, shower and radiator were replaced and the basin was mounted onto a vanity unit with marble top.

 

 

 

 

2 250 x 300 basin unit

 

 

 

 

 

 

 

 

3 250 x 300 shower 1

 

 

 

 

 

 

 

 

5 250 x 300 radiator 1

 

 

 

 

 

 

 

 

4 250 x 300 valve

 

 

 

 

 

 

 

 

6 250 x 300 radiator 2

 

 

 

 

 

 

 

 

7 250 x 300 basin unit

Bathroom refit with shower and bathroom furniture

May 17, 2009 at 10:42 pm | Posted in Bathrooms, Ensuites, plastering, plumbing, radiators, showers, Skimmed ceilings, Skimmed walls, Tiling | 1 Comment
Tags: , , , , , , , , , , ,

1 250 x 300 shower, cabinet and basinThis bathroom in Huntingdon was refitted to remove the bath and fit a large shower enclosure with a tall cabinet.  The basin and toilet were replaced, the floor was tiled, the ceiling was skimmed and the walls were painted.  Spotlights were fitted to the smooth ceiling.

 

 

 

 

 

2 250 x 300 basin

 

 

 

 

 

 

 

 

 

3 250 x 300 toilet

 

 

 

 

 

 

 

 

4 250 x 300 radiator

 

 

 

 

 

 

 

 

5 25 x 300 shower

 

 

 

 

 

 

 

 

6 250 x 300 valve

Ensuite refit in Stukeley Meadows

May 17, 2009 at 9:03 pm | Posted in Bathrooms, Ensuites, plastering, plumbing, radiators, showers, Skimmed ceilings, Tiling | Leave a comment
Tags: , , , , , , , , , , ,

250 x 300 shower and tilingThis ensuite in Stukeley Meadows was refitted with tiling, replacing radiator for towel rail radiator, ceiling skim with spotlights, basin and toilet refit, and shower refit.

 

 

 

 

 

 

250 x 300 toilet basin and tiling250 x 300 basin

 

 

 

 

 

 

 

 

 

250 x 300 radiator250 x 300 toilet

Ensuite with porcelain tiles

May 17, 2009 at 8:20 pm | Posted in Bathrooms, Ensuites, plastering, plumbing, radiators, showers, Skimmed ceilings, Tiling | Leave a comment
Tags: , , , , , , , , , ,

250 x 300 shower 1This ensuite refit in Huntingdon consisted of making alterations to allow as large an enclosure as possible to fit into the ensuite.  The ceiling was skimmed, the walls and floor were tiled with porcelain tiles, and a radiator was replaced with a towel rail radiator.

 

 

 

 

 

250 x 300 enclosure and toilet

250 x 300 shower  light on

 

 

 

 

 

 

 

 

250 x 300 tiling and concealed valve

Bathroom refit and tiling – Hinchingbrooke

May 11, 2009 at 12:49 am | Posted in Bathrooms, plumbing, radiators, showers, Tiling | Leave a comment
Tags: , , , , , , , , ,

The old suite was replaced with a new suite.  Furniture was put together and the floor and walls were tiled.  The tiling on the walls included a chrome beading.  A towel rail radiator was installed.

250 x 300 tiling behind shower fitting250 x 300 basin with red and white tiles and chrome trim

Bathroom refit in Huntingdon Town Centre Flat

May 11, 2009 at 12:42 am | Posted in Bathrooms, plastering, plumbing, showers, Skimmed ceilings, Skimmed walls, Tiling | Leave a comment
Tags: , , , , , , , , , , ,

This bathroom refit in a flat in Huntingdon town centre involved removal of a disabled bath and old suite and replacing with a new suite and shower.

Bathroom furniture was put together, a false wall was constructed to conceal pipework and the ceiling and two walls were skimmed.  The other walls and the floor were tiled.

250 x 300 disabled bath250 x 300 old basin and toilet

250 x 300 shower

250 x 300 shower wall work in progress250 x 300 false wall250 x 300 back wall plastered250 x 300 false wall tiled250 x 300 loo & basin after350 x 250 bath

Creating a second ensuite

May 10, 2009 at 11:35 pm | Posted in Bathrooms, Ensuites, plastering, plumbing, Room Construction, showers, Skimmed ceilings, Skimmed walls, Tiling | Leave a comment
Tags: , , , , , , , , , , ,

250 x 300 shower finishedAn airing cupboard on a landing with hot water tank was relocated and this extra space plus part of the bedroom were sectioned off to construct an Ensuite with wc, basin and shower.  This was part of a larger project where other work was also done.

 

 

 

 

 

 

250 x 300 shower and toilet200 x 150 pic 1200 x 150 pic 2

 

 

 

 

200 x 150 pic 3200 x 150 pic 4

 

 

 

 

 

200 x 150 pic 5200 x 150 pic 6

 

 

 

 

 

200 x 150 pic 7200 x 150 pic 8

 

 

 

 

 

200 x 250 pic 9200 x 150 pic 10

 

 

 

 

 

 

 

200 x 150 pic 11200 x 150 pic 12

 

 

 

 

 

200 x 150 pic 13200 x 150 pic 14

 

 

 

 

 

200 x 150 pic 16200 x 150 pic 17

 

 

 

 

200 x 150 pic 18200 x 150 pic 19

 

 

 

 

 

 

 

200 x 150 pic 20200 x 150 pic 21

 

 

 

 

 

 

 

200 x 150 pic 22200 x 150 pic 23

 

 

 

 

 

 

 

200 x 150 pic 24200 x 150 pic 25

 

 

 

 

 

 

 

200 x 150 pic 26200 x 150 pic 27

 

 

 

 

 

 

 

200 x 150 pic 28200 x 150 pic 29

 

 

 

 

 

 

 

200 x 150 pic 30200 x 150 pic 31

 

 

 

 

 

 

 

200 x 150 pic 32200 x 150 pic 33

New main bathroom

May 10, 2009 at 10:37 pm | Posted in Bathrooms, plastering, plumbing, Room Construction, showers, Skimmed ceilings, Skimmed walls, Tiling | Leave a comment
Tags: , , , , , , ,

250 x 200 finished bath and toiletThis bedroom was turned into a new main bathroom and a shower, bath, wc, and towel rail radiator were installed after new pipes were laid.  All fittings were concealed to a high spec and tiling was also part of this project to the floor, walls and mosaic areas.

 We co-ordinated the activities of an electrician and specialist tiler.

 

 

 250 x 200 pipework250 x 300 shower concealed250 x 300 radiator concealed

Ensuite Refit 1 – Huntingdon

May 10, 2009 at 9:14 pm | Posted in Ensuites, plastering, plumbing, Tiling | Leave a comment
Tags: , , , , , , ,

Bathroom refit with shower, bath, wc, basin, plastered ceiling and walls, tiling to floor and walls

The photos below show this project in progress in Huntingdon.  The old shower, wc, basin and false wall removed which immediately created a light airy room.  The waste stack boxing in was removed and a new stud wall was created with alcoves for basin and swivel storage mirrors. 

The ceiling and all walls plastered (backing plaster and skim).  A concealed wc was then fitted with access to the cistern lid by lifting up black marble worktop.

The ceiling and all walls plastered (backing plaster and skim).  A concealed wc was then fitted with access to the cistern lid by lifting up black marble worktop.

 A 900mm x 900mm Quadrant shower cubicle was then fitted with concealed shower valve and a 2 bar pump.

 Tiling was then done to floor and shower cubicle walls.  The Pull light switch was moved from within the en-suite and put onto the outside wall.  Spotlights were installed in alcoves and shower spotlight.  Painted white & black for modern finish.

 200 x 250 Ensuite refit 2 Huntingdon finished  200 x 250 shower  150 x 200 ceiling with old light  150 x 200 old toilet plumbing

150 x 200 old plumbing  150 x 100 old plumbing 2  150 x 100 studwork for recess

250 x 200 old ceiling artex  250 x 200 plastered recess  150 x 200 shower pipework

200 x 150 skimming on stilts  200 x 250 skimming recess  250 x 200 skimmed recess

250 x 200 tiling to shower cubicle before tray  200 x 250 tiled cubile  200 x 250 tiled floor and painted recess no radiator  200 x 250 recesses painted

200 x 250 recess with mirrors and concealed toilet  250 x 200 basin in recess  250 x 200 concealed wc

Next Page »

Blog at WordPress.com.
Entries and comments feeds.