New main bathroom
May 10, 2009 at 10:37 pm | Posted in Bathrooms, plastering, plumbing, Room Construction, showers, Skimmed ceilings, Skimmed walls, Tiling | Leave a commentTags: basin, bathroom refit, Bathrooms, ensuite, plumbing, showers, Tiling, toilet
This bedroom was turned into a new main bathroom and a shower, bath, wc, and towel rail radiator were installed after new pipes were laid. All fittings were concealed to a high spec and tiling was also part of this project to the floor, walls and mosaic areas.
We co-ordinated the activities of an electrician and specialist tiler.
Leave a Comment »
Blog at WordPress.com.
Entries and comments feeds.
Leave a comment