Major bathroom refit – Huntingdon

May 10, 2009 at 7:54 pm | Posted in Bathrooms, plastering, plumbing, Tiling | Leave a comment
Tags: , , , , , , ,

250 x 200 finishedAn outdated bathroom suite was replaced with a more modern design.  The bathroom was completely gutted and a false wall was knocked down to create enough floor space for a luxury bath suite to be fitted.

The patterned artex ceiling was smoothed and spot lights installed to compliment the modern design.  A large bathroom mirror was hung onto the wall with spotlights installed above it.  The whole bathroom was tiled and special attention given to the tiling around the window frame.  A special tiled unit was also constructed provide matching storage facilities in this family bathroom. Finally a towel rail style radiator was installed

250 x 200 old250 x 200 pipework200 x 200 tiled unit250 x 200 white radiator in progress

Advertisements

Leave a Comment »

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.
Entries and comments feeds.

%d bloggers like this: