Major bathroom refit 1 – Stukeley Meadows

May 10, 2009 at 4:43 pm | Posted in Bathrooms, plumbing, Tiling | Leave a comment
Tags: , , , , ,

Bathroom refit with shower, bath, wc, basin, plastered ceilings, & tiling to floor and walls. The photos below show this project in progress in Stukeley Medows, Huntingdon

An archway was removed to create room for the bath and shower to be installed.  The basin and wc were installed after the ceiling was plastered to make smooth from patterned artex. 

Tiling was done to the floor and walls

250 x 200 old archway250 x 200 old window250 x 200 pipework200 x 250 new wc and basin200 x 250 finished 2 shower

Advertisements

Leave a Comment »

RSS feed for comments on this post. TrackBack URI

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.
Entries and comments feeds.

%d bloggers like this: